United States. Federal Transit Administration.
Author
Pub. Date
1999.
Description
The Southeast Corridor Multimodal Project was created to improve transportation throughout the booming south I-25 and I-225 corridors. This project will introduce light rail transit along side highway expansion. And for the first time, an effort will be made to look at pedestrian and cycling improvements throughout the entire corridor as a part of the transportation solution.
Author
Pub. Date
1993
Description
The STIP is the planning document that identifies the transportation projects CDOT intends to fund over a six year period. It is prepared in cooperation with local government entities throughout the State, including Transportation Planning Regions (TPRs) & Metropolitan Planning Organizations (MPOs)
Pub. Date
2016.
Description
This Final EIS updates the analysis for the Supplemental Draft EIS alternatives, and identifies a preferred alternative. This document also responds to the stakeholder comments received during the Supplemental Draft EIS public review period. The Preferred Alternative is identified as the Partial Cover Lowered Alternative with Managed Lanes Option.